Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aboukhadra, W (2021) Learning organisation, affective commitment and cultural intelligence: the case of expatriates in the Gulf Co-operation Council countries, Unpublished PhD Thesis, , Nottingham Trent University.

Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions, Unpublished PhD Thesis, , Nottingham Trent University.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran, Unpublished PhD Thesis, School of Science and Technology, Nottingham Trent University.

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects, Unpublished PhD Thesis, , Nottingham Trent University.

Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies, Unpublished PhD Thesis, , Nottingham Trent University.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance, Unpublished PhD Thesis, , Nottingham Trent University.

  • Type: Thesis
  • Keywords: construction project; lean construction; performance; workforce; documentation; production planning; refurbishment; culture; optimisation; action research; interview; workshops; Australia; quantitative analysis
  • ISBN/ISSN:
  • URL: http://irep.ntu.ac.uk/id/eprint/31787/
  • Abstract:
    The thesis presents the findings from the longitudinal implementation of lean construction on the ongoing refurbishment of an integrated liquefied natural gas (LNG) plant in North Western Australia. Refurbishment of existing plant is a sub-sector of the Engineering Construction (EC) industry, an industry involved in the design and construction of large-scale industrial facilities including oil and gas plants. The sector is called engineering construction in the United Kingdom and Australia and industrial construction in the United States and Canada. EC is beset with poor performance levels in terms of cost, time and quality outcomes. Despite the ongoing use of innovative practice, the sponsor company experienced similar optimisation challenges in the process of executing construction projects. The research problem was the performance achieved on the ongoing refurbishment projects. The research aim was to investigate the impact a collaborative planning approach on performance and develop implementation guidance. A quantitative analysis of data from the Sponsor Company (SC) documentation revealed wastes specific to EC refurbishment projects, including transportation and movement, with attendant planning issues. Lean construction uses a collaborative planning approach to act against waste, particularly transportation and movement. Therefore, lean construction was viewed as an appropriate approach to act as an antidote. Observational research was used to address a gap in literature which is the lack of research investigating EC culture and environment. Action research (AR) over 7 cycles, was used to investigate the implementation of elements of the Last Planner® System (LP®S), a collaborative production planning approach, and a collaborative knowledge transfer tool called Team Work Design (TWD), designed and applied by the researcher. Primary data for analysis was extracted from LPS reporting and semi-structured interviews, with secondary data obtained from SC documentation. The longitudinal field research informed the development of implementation guidance. This addressed a gap in knowledge, which is the shortage of such guidance. The study contributed to research practice and to knowledge. Contributions to practice included the development of guidance for the implementation of the LPS, the development of the TWD tool and the use of pull planning workshops to develop the work strategy and master programmes. Contribution to knowledge included the demonstration of workforce ability to autonomously evolve lean construction practice in response to the work environment. The implication of the research is that the guidance will inform future LPS and TWD implementation.

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Hurst, A G (2009) Management education, training and development of construction managers: will they ever learn?, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Jaafar, T (1992) A unified methodology for project planning risk, Unpublished PhD Thesis, , Nottingham Trent University.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy, Unpublished PhD Thesis, , Nottingham Trent University.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects, Unpublished PhD Thesis, , Nottingham Trent University.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach, Unpublished PhD Thesis, , Nottingham Trent University.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Payne, B (1998) Project risk analysis, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Pritchard, C (2005) Skin cancer prevention in the house building industry, Unpublished PhD Thesis, , Nottingham Trent University.

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach, Unpublished PhD Thesis, , Nottingham Trent University.

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.